Acta Metallurgica Sinica(English letters)
Previous Articles
ZHANG Jun-guang; LÜ Ting-jie; ZHAO Yu-mei
Received:
Revised:
Online:
Contact:
Abstract: This paper studies a new software project planning method under some actual project data in order to make software project plans more effective. From the perspective of system theory, our new method regards a software project plan as an associative unit for study. During a top-down estimation of a software project, PERT method and analogy method are combined to estimate its size, then effort estimation and specific schedules are obtained according to distributions of the phase effort. This allows a set of practical and feasible planning methods to be constructed. Actual data indicate that this set of methods can lead to effective software project planning.
Key words: planning; top-down; average productivity; estimation method
CLC Number:
TP311. 5
ZHANG Jun-guang; LÜ Ting-jie; ZHAO Yu-mei. Study on top-down estimation method of software project planning.[J]. Acta Metallurgica Sinica(English letters), doi: 100528885 (2006) 0220108204 .
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://jcupt.bupt.edu.cn/EN/100528885 (2006) 0220108204
https://jcupt.bupt.edu.cn/EN/Y2006/V13/I2/108